Project Description

Location: Newberg, OR

This new installation of building automation system involved 3-story, 45,000 ft2 underfloor air distribution school facility project. A central rooftop air handling unit with 100% outside air economizer capability supports 40 Fan Coil Units. Life-safety and fire-alarm tied in with building automation system. EPE was the Prime Commissioning Consultant. The total construction cost of the project was $7.2 million.

Owner: George Fox University

Client: George Fox University