Project Description
Location: Portland Oregon
EPE was the prime commissioning authority for SERA Architect’s new Portland headquarters on the 5th floor of the historic Galleria Building. Innovative ventilation is delivered using three operating modes (passive, active and IAQ).This design and construction approach allows for deep energy savings and occupant comfort. Real time measurement and verification (M&V) of IAQ, power and water consumptions are displayed to occupants through a visual dashboard system in the lobby area.
Owner: UNICO Properties
Client: SERA Architects
Architect: SERA Architects
General Contractor: Fortis Construction
MEP Designer: Ecotope, PAE Engineers